Project Description

Doubletree by Hilton Hotel & Spa, Chester

Doubletree by Hilton Hotel & Spa, Chester
A phased development comprising of the refurbishment of the existing lobby to provide high end meeting spaces and a new reception area following by the construction of a new 79 bedroom wing on the existing site.
The new hotel block was constructed over 3 floors with a detached plant area to the rear of the building, heating and cooling was provided via a hybrid vrf system with ventilation provided via room mounted heat recovery units.
CGP | MEP provided the detailed design of the mechanical services for the design and build contractor.
Project Details
Client: PFI Mechanical Services
Project Manager: Undisclosed
Architect: Falconer Chester Hall
Main Contractor: Undisclosed
MEP Contractor: T Clarke
Our Services
- RIBA Stage 4
More Projects
- Knaresborough Health & Wellbeing Centre
Knaresborough Health & Wellbeing Centre
- Arsenal Player Performance Centre
Arsenal Player Performance Centre








/NQA-ISO-9001-Logo-UKAS.jpg)
/NQA-ISO-14001-Logo-UKAS.jpg)
/NQA-ISO-45001-Logo-UKAS.jpg)