Project Description

Leeds Art Gallery

Leeds Art Gallery

As part of the overall view gallery refurbishment we were engaged, along with the MEP Contractor, to review and provide an enhanced heating, cooling and ventilation strategy to the existing view galleries within the listed Art Gallery in Leeds City Centre.

In keeping with the listed elements and constraints for the project the brief was to provide a temperature controlled VRF system to provide a more comfortable customer experience
Any solution had to be concealed from view within a purpose made enclosure to ensure it was signed off as part of the listed building consent.

CGP MEP worked closely with the MEP Contractor to develop a number of options for providing a new heating, cooling and ventilation solution to the existing viewing galleries for Client approval before completing the detailed design for installation.

Project Details

Client: T Clarke

Project Manager: Undisclosed

Architect: Undisclosed

Main Contractor: Undisclosed

MEP Contractor: Undisclosed