Project Description

Wynard Primary School

Wynard Primary School
Wynard Primary school was a new build steel framed two storey building with three external stairways linking the school between split levels.
The school has a total of 459 places with 420 in the school and 39 in the nursery.
New external space was created and includes a new full sized main sports pitch.
The lean design of the building surpassed building requirements by over 20% without the need for renewables.
Project Details
Client: Department for Education
Project Manager: Undisclosed
Architect: Watson Batty
Main Contractor: ISG
MEP Contractor: T Clarke
Our Services
- RIBA Stages 4 – 7
- BIM Level 2
- COBie
- Part L2a assessment
- TM52 assessment
More Projects
- Harrogate Leisure & Wellness Centre
Harrogate Leisure & Wellness Centre
- Doubletree by Hilton Hotel & Spa, Chester
Doubletree by Hilton Hotel & Spa, Chester








/NQA-ISO-9001-Logo-UKAS.jpg)
/NQA-ISO-14001-Logo-UKAS.jpg)
/NQA-ISO-45001-Logo-UKAS.jpg)