Project Description

Keele University

Keele University

This project consists of CGP MEP Ltd completing RIBA Stage 1-3 design with Stage 4-7 client design validation and on site monitoring of a new Veterinary School for Keele University.

The new Veterinary School consists of;

  • 114 Seater Lecture Theatre
  • Teaching Spaces for a full student occupancy of 550 students
  • Cat 2 ‘Wet’ Laboratory
  • Dry Laboratory
  • Ancillary Support Spaces
  • Space and services allowances within category A fit out spaces for future occupation of a potential operating veterinary practice.

The scheme has to achieve a BREEAM Very Good rating on completion, so CGP MEP also provided energy advise and modelling for the preliminary design stage to ensure compliance with the regulations including Part L2a.

Project Details

Client: Noviniti

Project Manager: Undisclosed

Architect: JSA

Main Contractor: Undisclosed

MEP Contractor: Undisclosed