Project Description

Ash Hill Academy

The Ash Hill Academy project was a £12m refurbishment including the demolishment of an existing science block and sports hall and the erection of a new replacement sports block with associated landscaping.
The new building includes:
- Sports hall
- Activity studio
- Changing facilities
CGP provided full design support from Stage 2 strategy to stage 4 developed design, fully coordinated, 3D model, energy analysis and heating & cooling load analysis.
Project Details
Client: DfE
Project Manager: Undisclosed
Architect: Pick Everard
Main Contractor: Bowmer & Kirkland
MEP Contractor: T Clarke
Contract Value: £12m
Our Services
- RIBA Stages 4 – 7
- BIM Level 2
- COBie
- Part L2a assessment
- TM52 assessment
More Projects
- Arsenal Player Performance Centre
Arsenal Player Performance Centre
/NQA-ISO-9001-Logo-UKAS.jpg)
/NQA-ISO-14001-Logo-UKAS.jpg)
/NQA-ISO-45001-Logo-UKAS.jpg)